Thursday, June 23, 2011

Survey on Future Use of Leisure Centre

The City of Grande Prairie is conducting a Feasibility study on the future use of The Leisure Centre.  Roger Field of Field, Field & Field Architecture-Engineering Ltd. will be conducting the survey and results.  
 
Your response to this survey will lead to recommendations made to City Council and Administration to determine the direction, future use, and upgrade of The Leisure Centre.  
 
An open house will be held on Wednesday, June 29th from 1 p.m. to 7 p.m. at The Leisure Centre.  Residents are encouraged to stop by to fill out a survey or have questions answered by Field, Field & Field, or the Leisure Centre staff.
 
If you are unable to attend the open house, please visit here to complete an online version of the survey.  All responses will remain anonymous and will be kept confidential.
 
 
 
 
Media enquires may be directed to:
Roger Field ​
Field, Field & Field ​​
Ph: 780-532-3690​
fields3@telusplanet.net
 

Monday, June 6, 2011

97 Ave Construction Begins Thursday

Starting Thursday, 97 Ave. traffic between Wapiti Road and 112 St. will be restricted to one lane to allow for major construction work.
Use of alternative routes to avoid the area if possible is advised. Motorists needing to reach businesses between 112 St. and 116 St. should use the following roads: 89 Ave, 84 Ave, 100 Ave, and 112 St, as side street access will be limited.
 
The City is investing about $900,000 in the project.
 
Improvements include the replacement of curbs and gutters, repairs to manholes and catch basins, milling of the existing asphalt, and replacement of the road surface.
 
“These intensive upgrades are important to maintain the City’s transportation infrastructure,” says Project Engineer Yao Kouadio. “We appreciate the patience of everyone affected during this temporary inconvenience.”
 
Work is scheduled to take until the beginning of August to complete.

LinkWithin

Related Posts with Thumbnails