Thursday, October 13, 2011

New Traffic Lights Being Installed


View Traffic List Installations in a larger map
The pins above mark the locations of the new lights.

Traffic Signal Construction Projects Begin

Installation of traffic lights will commence today in three separate locations.

Crews will at begin at the 104 Ave. and 92 St. intersection, continue to the 116 Ave. and 96 St. intersection and finish at Kateri Drive where a pedestrian crossing will be erected near Derek Taylor School.

Most of the work will be carried-out away from the road, but some delays are expected when the signal poles and overhead light arms are craned into place.

Patience is appreciated as the addition of traffic signals to these busy intersections will significantly improve safety.

Media enquiries may be directed to:
Roger Hodgson
Project Engineer
780.513.5229
rhodgson@cityofgp.com

Monday, September 26, 2011

Ice Delay Possible at Dave Barr Arena

Installation of ice at the newly renovated Dave Barr Community Centre may be delayed until October 27, a few weeks beyond the originally scheduled Oct. 11 date. 

Improvements to the rink at the Dave Barr Community Centre are taking longer than expected. A $1.4-million project has included a new condenser, boards and glass, and revamping of the heating and ventilation system. Fire sprinklers and other infrastructure needs were also addressed.

Dave Barr management is working with Coca-Cola Centre and Crystal Centre personnel to accommodate ice time demands. User groups have been made aware of the projected delay.

The delay is connected with the manufacture and installation of the board and glass system. 

Once these are in place, staff will work around the clock, with help from the City’s other two arenas, to ensure the ice surface is in as quickly as possible.

“We are working to tighten-up the time frame of when user groups can get onto the ice,” says Garry Roth, Community Services Director. “Running extra shifts will minimize the down-time.”

Monday, July 11, 2011

Help Name The New Fire Hall!

The City of Grande Prairie is encouraging the public to take part in a process to help name the Third Fire Station.

This is the first time residents have been invited to participate in the naming of a City fire facility.

The two existing stations bear the names of historical community figures. The North Hall is named after William Salmond – an area pioneer – and the South Hall recognizes Pete Eagar – the first full-time Fire Chief of the Grande Prairie Fire Department.

“This is an opportunity to involve citizens in a positive, community-building experience,” says Dan Lemieux, Fire Chief. “We want to celebrate the contributions of our founders.”

Residents can send an e-mail to thirdfirehall@cityofgp.com with a nominee and a rationale of 100 words or less explaining why the Third Fire Station should be named after that person. 

Proposals can also be mailed to Rick Adair at P.O. Bag 4000, Grande Prairie, AB, T8V 6V3.

A safety related prize will be awarded for the winning submission!

“The Station doesn’t necessarily have to be named after a fire-related figure,” says Rick Adair, Project Manager of the Third Fire Station. “The Grande Prairie Fire Department appreciates the role all our community builders played in shaping the city.”

The deadline for nominees is September 15. City Council will have final approval of the Third Fire Station name.

The new facility, located at 97 Avenue and 118 Street, will open in Spring 2012.

Wednesday, July 6, 2011

Health Advisory Council Meeting

So, this isn't city business but I know people are interested in the state of healthcare in our city and the province so when I got notice of this in my email inbox I thought I'd share it. I've put the important sections into a BOLD font.

If you have any questions or comments, I CANNOT ANSWER THEM: Please direct them to the health advisory council at:

Peace Health Advisory Council
peace@albertahealthservices.ca
1-877-275-8830



Dear Community Stakeholder:
The Peace Health Advisory Council would like to invite and engage with all interested individuals and groups to attend either of the health care forums we are hosting in July and August to provide input on local and regional health and provide feedback to Alberta Health Services regarding health care services in our North Zone.

On Thursday, July 21, 2011 from 5:00 to 8:00 p.m. we will be in Grande Prairie and on Wednesday, August 17, 2011 we will be in Peace River. Location in Grande Prairie is the Elks Hall 10806-106 St.

Part of our mandate as a health advisory council is to engage the public to gather opinions, concerns, bright ideas or suggestions on gaps and opportunities and to share success stories related to health care services and to relay the messages to Alberta Health Services.

The forums will be an excellent opportunity for the Peace Health Advisory Council to gather feedback from the public. The open mike format will be utilized with each speaker allowed two to five minutes to present their information. We will be happy to accept any written presentations whether as supporting documents or as the entire presentation. Additionally, should you wish to present to the Peace Health Advisory Council at a regular council meeting at a later date you may request an opportunity to do so. The information we receive from the public forums will be condensed into an advisory report to Alberta Health Services regarding local ideas, opportunities, challenges and opinions.

We are very interested to hear your opinion regarding health services. Please be advised the Peace Health Advisory Council does not have the mandate to deal with individual patient concerns or the day to day operations of the health centres but rather works in an advisory capacity to Alberta Health Services.

Please join the members of your Health Advisory Council on either date to share your ideas and provide feedback about health care in our area so that we can ensure that we convey your message to Alberta Health Services.

Respectfully,
Theresa Sandul, Chair
Michael Ouellette, Vice-Chair

GP's First BMX Park!

BMX Site To Be Ready By August

Construction on Grande Prairie’s first BMX bike park is set to begin Thursday.

Located west of the off leash dog park in the South Bear Creek section of Muskoseepi Park, the site was chosen for its high visibility, availability of space, and accessibility from park trails. It’s also adjacent to neighbourhoods and schools. The bike park will be completed in about three weeks.

 “The BMX park was made possible by the generous support of Wapiti Gravel Suppliers which delivered and levelled over 10,000 cubic meters of soil and Genivar providing free design consultation, engineering and surveying services,” says Laurie Barry, Operations Manager at Muskoseepi Park.

“This is a community partnership driven by the local BMX enthusiasts who wanted something positive for youth to develop their interest in the sport and we are proud to add this facility to the park”

A ribbon-cutting ceremony to officially open the facility is scheduled for Park’s 25th Anniversary event on the August long weekend.

Thursday, June 23, 2011

Survey on Future Use of Leisure Centre

The City of Grande Prairie is conducting a Feasibility study on the future use of The Leisure Centre.  Roger Field of Field, Field & Field Architecture-Engineering Ltd. will be conducting the survey and results.  
 
Your response to this survey will lead to recommendations made to City Council and Administration to determine the direction, future use, and upgrade of The Leisure Centre.  
 
An open house will be held on Wednesday, June 29th from 1 p.m. to 7 p.m. at The Leisure Centre.  Residents are encouraged to stop by to fill out a survey or have questions answered by Field, Field & Field, or the Leisure Centre staff.
 
If you are unable to attend the open house, please visit here to complete an online version of the survey.  All responses will remain anonymous and will be kept confidential.
 
 
 
 
Media enquires may be directed to:
Roger Field ​
Field, Field & Field ​​
Ph: 780-532-3690​
fields3@telusplanet.net
 

Monday, June 6, 2011

97 Ave Construction Begins Thursday

Starting Thursday, 97 Ave. traffic between Wapiti Road and 112 St. will be restricted to one lane to allow for major construction work.
Use of alternative routes to avoid the area if possible is advised. Motorists needing to reach businesses between 112 St. and 116 St. should use the following roads: 89 Ave, 84 Ave, 100 Ave, and 112 St, as side street access will be limited.
 
The City is investing about $900,000 in the project.
 
Improvements include the replacement of curbs and gutters, repairs to manholes and catch basins, milling of the existing asphalt, and replacement of the road surface.
 
“These intensive upgrades are important to maintain the City’s transportation infrastructure,” says Project Engineer Yao Kouadio. “We appreciate the patience of everyone affected during this temporary inconvenience.”
 
Work is scheduled to take until the beginning of August to complete.

LinkWithin

Related Posts with Thumbnails